Week 8 has come to an end, man time really does fly. This past week was a bit slow, me and my colleagues decided to get together to come up with a list of priorities to keep us busy these next two weeks. We hope to finalize a design and have a prototype built before my 10 weeks are up but this may not be realistic, it depends on how quickly we can order parts and get them here. So far throughout this whole experience the tricky thing has been figuring out what we want to use. Originally we worked with the temperature sensor but had no real solution for depth sensing that was cost effective. Now we believe we may have found a sensor that will take care of both our temperature and depth measurements. If we decide to use this sensor for these measurements then all we will need to do is come up with a solution for the water proof enclosure and we will be close to having a functional prototype that we could start testing. With two weeks left it will be interesting to see what more we can get done.
|
AuthorThis blog is authored by me, Omar White. Learn more about me here Archives
September 2015
Categories |